<ul id="wcqya"></ul>
<strike id="wcqya"></strike>
  • <strike id="wcqya"></strike>
    Current Location: Home>>News>>Company News

    News

    Contact Us

    Yancheng Chongda Petrochemical Machinery Co., Ltd

    General Manager: 13770027868

    Manager Xu: 18921851996

    Phone: 0515-86570558

    Email: yccd@www.lvkeang.com

    Add: No. 99 Dacui Road, Lugou Town, Jianhu County, Jiangsu Province

    No. 88 Zhengda East Road, Lugou Town, Jianhu County, Jiangsu Province

    Web: www.www.lvkeang.com


    How to operate a Christmas tree

    2024/08/18
    67

    Christmas tree is a wellhead device used for extracting oil, such as self jetting wells and machine extraction wells. It is the main equipment for controlling and regulating oil and gas production at the top of oil and gas wells, mainly composed of three parts: casing head, tubing head, and production (gas) tree body.

    1、 Opening a well (self jetting well): 1. Ensure that the production system is complete and the process is smooth enough to accept the fluid after opening the well. 2. All valves on the Christmas tree are in the correct on/off state, controlling the oil nozzle (adjustable oil nozzle). 3. Check the oil pressure at the wellhead and the status of safety equipment.

    2、 Closing the well (self spraying well): 1. Close the oil nozzle. 2. Close the wing valve. 3. Close the ground safety valve if necessary. 4. Close the main valve if necessary.

    3、 In some underground operations, the operation steps of the Christmas tree valve are as follows:

    1. Close the well (oil nozzle, wing valve, wax removal valve, surface safety valve, and main valve) before entering the downhole tool.

    2. Open the Christmas tree cap, install the riser and blowout preventer, and then conduct a pressure test on the riser.

    3. Open the ground safety valve and lock it with a fused threaded cap. Test the reliability of locking the threaded cap in the open position.

    4. Lock the hydraulic control circuit of the downhole safety valve of the oil pipe and test its reliability.

    5. Open the main valve and then open the wax removal valve.

    6. Hang labels on the locking parts of the main valve, wax removal valve, and safety valve to prevent other personnel from tampering with the valves.

    7. Tools for underground operations.

    8. After the downhole operation tool is lifted onto the riser, close the main valve and wax cleaning valve.

    After depressurizing and removing the riser of the blowout preventer, install the Christmas tree cap,

    10. Remove the locking thread cap of the ground safety valve, open the hydraulic locking valve of the downhole safety valve of the oil pipe, and remove the attached label,

    11. Open the well for production according to the instructions.



    ?
    Contact Us
    Sales Hotline:137-7002-7868
  • Mail:

    yccd@www.lvkeang.com

  • Web:

    www.www.lvkeang.com

  • Add:

    No. 99 Dacui Road, Lugou Town, Jianhu County, Jiangsu Province / No. 88 Zhengda East Road, Lugou Town

  • WeChat

  • WeChat

  • 久久99久久99精品免观看| 国产精品喷水在线观看| 免费无码精品黄AV电影| 中文字幕在线精品| 久久久久久国产精品免费免费| 精品三级在线观看| 国产99视频精品草莓免视看| 精品无码人妻一区二区三区品| 影院无码人妻精品一区二区| 国产精品1区2区3区在线播放| 亚洲精品国偷自产在线| 精品少妇人妻av无码专区 | 亚洲第一区精品日韩在线播放| 12345国产精品高清在线| 日韩精品在线观看| 精品一区二区三区无码免费直播| 麻豆国产精品免费视频| 久久在精品线影院精品国产| 国产精品手机在线观看你懂的| 图片区精品综合自拍| 国产精品大白天新婚身材| 国产成人综合日韩精品无码不卡| 国产在线高清精品二区色五郎| 无码精品A∨在线观看十八禁| 亚洲国产精品婷婷久久| 国产一精品一AV一免费| 精品久久久久久久久久中文字幕 | 亚洲av午夜福利精品一区人妖| 国产精品小黄鸭一区二区三区| 精品日韩二区三区精品视频| 久久这里的只有是精品23| 精品人妻大屁股白浆无码| 日本久久久精品中文字幕| 国产精品国产高清国产专区| 精品国产一区二区三区免费看| 2020国产成人久久精品| 亚洲国产精品免费在线观看| 色婷婷在线精品国自产拍| 亚洲国产精品无码久久SM| 亚洲国产一二三精品无码| 99热成人精品热久久669|